Transfer Chute and Trolley Upgrade

Transfer Chutes And Trolley Upgrade Inline

Transfer Chute and Trolley Upgrade

In order to facilitate a higher production rate, a new larger chute was required on one of our clients transfer stations and with the extra weight a heavier duty maintenance trolley needed to be designed and installed.

With our fabricators in Perth producing the trolley, handrails and lead out box and our Port Hedland workshop team manufacturing the wheels, pins and bushes, we stripped the old chute assembly out, welded in structural stiffeners and upgrade the whole transfer station to the new engineered requirements for its targeted higher run rate.

Transfer Chutes And Trolley Upgrade Inline
Transfer Chute And Trolley Upgrade Engineering 200x300
Transfer Chute And Trolley Upgrade Inline 200x300
Transfer Chute And Trolley Upgrade Inline Engineering 200x300

Our Locations

PERTH OFFICE

22 Zedora Turn, Henderson WA 6166

TEL: (08) 9437 5252

PORT HEDLAND OFFICE

Lot 3758, Kangan Way, Wedgefield WA 6721, Australia

TEL: (08) 9172 2179

We provide engineering services to all major WA regions including: 

Broome | Bunbury | Esperance | Geraldton | Henderson | Kalgoorlie | Karratha | Newman | Pilbara | Port Hedland | Western Australia